- Mar 23, 2010
-
-
Erik Verbruggen authored
-
Erik Verbruggen authored
-
Erik Verbruggen authored
-
Erik Verbruggen authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Marco Bubke authored
Task-Id: BAUHAUS-472
-
Friedemann Kleint authored
Handle the new version's formatting of integer types as '0n...'. List shorts as int-types.
-
Erik Verbruggen authored
Patch by: Bill King
-
Erik Verbruggen authored
-
Jens Bache-Wiig authored
I fixed the tab offset so that we remove the double border of the first tab also when only one tab is visible.
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
Roberto Raggi authored
-
hjk authored
-
hjk authored
-
hjk authored
-
Roberto Raggi authored
The check should be done in the semantic phase.
-
Roberto Raggi authored
-
Erik Verbruggen authored
-
Roberto Raggi authored
-
Kai Koehne authored
-
Erik Verbruggen authored
-
Thorbjørn Lindeijer authored
-
Thorbjørn Lindeijer authored
Some Qt Designer actions stayed visible and/or active while editing source files or when using the QML Designer even though they shouldn't. Fixed that by applying some manual context handling in the DesignMode. Reviewed-by: con Reviewed-by:
Lasse Holmstedt <lasse.holmstedt@nokia.com>
-
- Mar 22, 2010
-
-
Kai Koehne authored
I accidentally removed a file from resources ;)
-
con authored
Reviewed-by: dt
-
Friedemann Kleint authored
Pass around shared context containing basic replacement map. CustomProjectWizard adds %ProjectName% to it obtained from signal BaseProjectWizardDialog::introPageLeft(). Move replacement code into context. Add new modifier 'c' for capitalizing words.
-
hjk authored
-
hjk authored
Needs work...
-
hjk authored
-
hjk authored
-
Thorbjørn Lindeijer authored
They're internal classes of the core plugin.
-
Thorbjørn Lindeijer authored
Some concurrent jobs, like getting 'git blame' output, do not report progress. Their the minimum and maximum of their progress range is always 0, but they do report when they are finished. When such a job finishes, we should make sure the progress bar indicates this. Reviewed-by: con
-
Thorbjørn Lindeijer authored
-